Ashanti Region
43 districts · 47 constituencies · Capital Kumasi
- In progressDrilling and mechanization of 4No. borehole with office and overhead tank at esaase SHS school, geninso CHPS compound, kwarkokrom CHPS and manso nkwanta
- Starting soonAccra to Kumasi Expressway, six lanesBig Push
- In progressTwo gas-fired power plants in Kumasi, 650 MWBig Push
- In progress1,535 acres of mined-out land reclaimed in Ashanti
- In progressThree cardiology centres: Korle Bu, Komfo Anokye and TamaleMahamaCares
- In progressRegional TVET Centres of Excellence in Salaga and Kumasi
- In progressFood processing plants: rice, poultry feed, cashew, onion and soya
- In progressUnfinished hospitals being completed in Accra and Kumasi
- In progressVolivo Bridge and Kumasi Inner Ring Road
- In progressRural water projects in eight towns
- In progressRenovation works at office accommodation of department of agriculture
- In progressConstruction of male and female urinal at dompoase market
- In progressKumasi Outer Ring Road, Lots 1 to 3Big Push
- In progressSiting, drilling and mechanization of 1-No. borehole at nayina
- In progressSiting, drilling and mechanization with overhead tank at wioso
- Delivered1,900 solar streetlights installed in Ashanti
- In progressSiting, drilling and mechanization of 1-No. borehole with overhead tank at bredi
- DeliveredBekwai home for older persons renovated
- In progressConstruction of 10No. borehole fitted with hand pump
- In progressConstruction of CHPS compound at anyinabrem
- DeliveredRehabilitation of duaponko d/a primary school block and teachers quarters
- DeliveredConstruction of 1No. 3 unit classroom block with office and store at kwamang sda
- DeliveredConstruction of male and female wards at ahenkro health centre
- DeliveredCompletion of 1 No. 5-unit classroom block at akom d/a prmary school i
- DeliveredConstruction of 9 No. mechanized boreholes with platforms and overhead tanks at nkwantakese, habitat, banko, tetrem, kwamang, boamang and kyekyewere
- DeliveredConstruction of 1 No. 2-units KG block with office and storeroom at kyekyewere methodist primary
- DeliveredConstruction of 1 No. dining hall at kyekyewere
- In progressConstruction of 1 No. six unit classroom block with office and store room
- In progressConstruction of 1 No. CHPS compound at penteng
- In progressDrilling and installation of 1 No. borehole fitted with hand pump
- In progressConstruction of 1 No. 5-bedroom 2-storey with fence wall and mechanised borehole with overhead tank at boamang
- DeliveredConstruction of executive lounge at DCE's residence at kodie
- In progressRenovation of old court to health center and ambulance service center
- In progressBankyease school block
- In progressProvision of boreholes
- In progressCompletion of 1No. k. g block atkyenkyenease
- In progressDrilling and mechanization of 4No. borehole with office and overhead tank district wide (abom, hiakose, akataniase, and abore)
- Starting soonConstruction of a 24-hour economy model market & commercial centre at manso abore in the amansie west district
- In progressRehabilitation of municipal health director's bungalow at juaso
- DeliveredDrilling and mechanization of 8 No. boreholes at adumasa, twedie(TVET), twedie(immigration), foase (education office), foase (health office), ampatia, kokoben & nweneso No.3
- In progressConstruction of 1No. mechanized borehole at asensuaso
- DeliveredDrilling and mechanization of 1No. borehole with 3.2m high concrete polytank stand with ladder and metal protector, 3.6m by 1.9m concrete pipe stand pad with overhead wall at awurade basa school at mangoase in obuasi west municipality
- DeliveredRehabilitation and mechanization of 1No. borehole with 3.2m high concrete polytank stand with ladder and metal protector, 3.6m by 1.9m concrete pipe stand pad with overhead wall at bediem experimental school
- DeliveredDrilling and mechanization of 1No. borehole with concrete polytank stand, pipe stand with concrete pad and overhead wall at methodist school in the obuasi municipality
- In progressRefurbishment of d/a primary b school at akumadan
- Starting soonConstruction of 1No. 3-unit classroom block with headmaster office, storeroom and staff common room at bosomponso
- Starting soonConstruction of 1No. 10-seater w/c with overhead tank connected to mechanized borehole at akumadan-frafra line
- Starting soonConstruction of 1No. 6-unit classroom block with head teacher's office, staff common room and ancillary facility at tontokrom
- Starting soonDrilling of borehole with hand pump at sraneso No.2
- Starting soonDrilling of borehole with hand pump at sraneso No.1
- In progressConstruction of community centre at yapesa
- In progressConstruction of block b market stores and lorry park complex at asiwa
- In progressConstruction of a police station with a mechanized borehole at nsuta
- In progressConstruction of 1No. 3-unit classroom block with office and storeroom at ankaase
- In progressConstruction of 1-No.24-hour economy market
- In progressCompletion of 1n0. abandoned KG block with 1n0. mechanized borehole with concrete stand and 1n0. 2000 liters polytank connected to electricity with kitchen and 1n0. 4-seater WC toilet at kuntanase
- In progressConstruction of 1n0. 2 unit KG block with kitchen, toilet and mechanized borehole and with concrete stand and 1 n0. 2000-liter polytank connected to electricity with overhead tank at atafram.
- In progressCompletion of 1 No. 2-appartments semidetached accommodation for bonkorkor CHPS compound
- In progressConstruction of 1 No.3 unit classroom block with offices and teachers hall and 1 No. 6-seater WC with mechanized boreholes and concrete stand and 1 No. 2000 liters polytank connected to electricity at bonkorkor
- In progressConstruction of 1 No. 6-unit classroom block, library, office and conference hall and 1 No.2000 liters polytank connected to electricity at konkoma
- In progressConstruction of 1No. mechanized borehole at ekyem
- In progressConstruction of 1No. mechanized borehole at asotwe
- In progressConstruction of 1No. mechanized borehole at jamase
- In progressConstruction of 1No. mechanized borehole at besease
- In progressConstruction of 1No. mechanized borehole at manhyia
- In progressConstruction of 1No. mechanized borehole at abankro
- In progressConstruction of 1No. mechanized borehole at asamang
- In progressConstruction of 1No. mechanized borehole at baworo
- In progressConstruction of 1No. mechanized borehole at ejisu zongo
- DeliveredProcurement and supply of 4No. refuse container
- In progressConstruction of 1No. mechanized borehole at edwenase
- In progressConstruction of 1No. mechanized borehole at abenase
- DeliveredReshaping of roads
- In progressDrilling and mechanisation of 5No. boreholes with reinforced concrete reservoir stand and overhead tank
- In progressDrilling and mechanisation of 5No. boreholes with reinforced concrete reservoir stand and overhead tank
- In progressDrilling and mechanisation of 4No. boreholes with reinforced concrete reservoir stand and overhead tank
- In progressConstruction of 1No. 2-unit KG block with office, store, auxilliary facilities and mechanized borehole at akotaa
- In progressConstruction of police station, mechanized borehole, furnishing and external works at kotokuom
- In progressToase bungalow
- In progressDrilling & mechanisation of 5n0. boleholes
- DeliveredMCE Residence
- DeliveredRenovation of CHPS compound
- In progressDrilling and mechanisation of 5-No. borehole
- In progressRehabitation of woraso presby school
- In progressCommunity boreholes (15 boreholes)
- In progressConstruction of 6No. mechanized borehole
- In progressConstruction of 1No. mechanized borehole at bonwire gyidiem
- In progressConstruction of 1No. mechanized borehole at krapa
- In progressConstruction of 1No. mechanized borehole at ejisu new town
- In progressConstruction of 1No. mechanized borehole at odaho
- In progressConstruction of 1No. mechanized borehole at ohenediem
- In progressConstruction of 1No. mechanized borehole at donyina
- In progressConstruction of 1No. mechanized borehole at domeabra
- In progressCompletion and furnishing of d.c.e's bungalow at new ayaase
- In progressCompletion of 1No. 3 unit classroom block with ancillary facilities
- In progressConstruction of 1No. 2- unit KG block with office toilet and store with staff bungalow at aduposo
- In progressConstruction of 1No. CHPS compound with staff bungalow at dasomimadwen
- In progressConstruction of 1No. 3 unit classroom block with office, staff common room and store with staff bungalow at sackitey
- In progressConstruction of 1No. CHPS compound with staff bungalow at saponso
- DeliveredDrilling and mechanization of 5 No. boreholes at akwasu, ejuratia new site, mpobi, aduman and aduamoah new site
- In progressConstruction and furninshing of 1No. 6-unit classroom block at akwasu
- In progressConstruction of clinic at petrensa.
- In progressRehabilitation of classroom block at krobo
- In progressConstruction of KG block at buosie
- In progressConstruction of 1No. 20-seater w/c toilet for male and females at aduman SHS
- In progressConstruction of 1No. 9-unit classroom block
- In progressConstruction of 1No. 3storey clinic at wioso
- In progressConstruction and furnishing of 1no administration block with w/c facility amponsem SHS at ejuratia
- In progressConstruction and furnishing of 1No. CHPS compound at dumakyi
- In progressDrilling of 10No. boreholes fitted with hand pumps at akwasu, ejuratia, mponsu, offiano, aworaso, ntiribuoho, mpobi, kwayamu, kodie, aboaboagya
- In progressDrilling and mechanisation of 5 No. boreholes at bodwesango, bronkrong, kyerease, apagya new site and akrofrom
- In progressDrilling and mechanisation of 5No. boreholes at atimatim chairman junction, brofoyedru, ebom, bomfa and DCE's residence
- In progressDrilling and mechanization of 5No. boreholes at edwenase, adubinsohese, adubinsu bia, taabuo and ampabame
- DeliveredCompletion of municipal health directorate office
- DeliveredSectional rehabilitation of administrative block
- In progressCompletion of 1No. chips compound
- In progressConstruction of 1No. mechanized borehole at okyerekrom
- In progressConstruction of 1No. 6- unit classroom block with staff common room and girls changing room.
- In progressConstruction of ward at manfo health center
- In progressConstruction of 1No. CHPS compound with ancillary facilities at nsuta
- In progressConstruction of 1No. CHPS compound with ancillary facilities at mmofra-mentukwa
- In progressConstruction of 1No. 3unit JHS block with ancillary facilities at banahenekrom
- In progressConstruction of 1No. 2unit KG block with ancillary facilities at nimfourkrom
- In progressConstruction of 1 No.6-unit primary school block with ancillary facilities at sabronum-nyamebekyere
- In progressDrilling of 5 No. mechanized boreholes with overhead platforms and storage facilities and 5 No. hand pump boreholes in selected communities.
- DeliveredConstruction of 2No. 8-seater institutional latrines at kunsu
- DeliveredConstruction of 2No. 8-seater institutional latrines at afreseni
- DeliveredConstruction of 2No. 8-seater institutional latrines at barniekrom
- DeliveredConstruction of 2No. 8-seater institutional latrines at wioso
- DeliveredDrilling and construction of 1No. borehole with hand pumps at adiembra
- DeliveredDrilling and construction of 1No. borehole with hand pump at mankranso
- DeliveredDrilling and construction of 1No. borehole with hand pump at asuokor-oseikrom
- In progressConstruction of 1No. 10seater water closet toilet facility at mankranso
- In progressConstruction of 1No. 2unit KG block with ancillary facilities at asuoabena
- In progressConstruction of 1No. 3-unit classroom block with ancillary facilities at kunsu
- In progressConstruction of 1No. CHPS compound and staff quarters at afreseni
- In progressConstruction of 1No. male, female and children ward with isolation centre at wioso
- In progressConstruction of 1No. 3unit classroom block storey with computer lab, staff common room, office and stores at mpasaaso No.2
- In progressConstruction of 1No. 3unit classroom block with ancillary facilities at oseikrom
- In progressConstruction of 1No. 6-unit classroom block with ancillary facilities at manhyia
- In progressDrilling and construction of 1No. mechanized borehole at sikafrebogya
- In progressConstruction of 1No. 24-hr economy market at mankranso
- DeliveredDrilling and construction of 2No. mechanized borehole at akrofuom
- DeliveredRenovation of 10-seater WC toilet at brofoyedru
- DeliveredFilling, graveling and reshaping of yawusukrom to nkoransah feeder road
- DeliveredSupply and installation of 1No. 60kva power plant at akrofuom district assembly
- DeliveredSupply of medical equipment, furniture and generators at yaadome and mpirekyire CHPS compound
- In progressCompletion of the construction of police station with 4- unit bedroom quarters at akrofuom
- In progressConstruction of 1No. 6 unit classroom block with office, store, library and 4-seater KVIP toilet at gyaasehenekrom
- In progressConstruction of 1No. CHPS compound with nurses' quarters at kramokrom
- In progressCompletion of the construction of 1No. 6-unit transit quarters at akrofuom
- In progressConstruction of 2-seater WC toilet and 2 shower at mensonso health center
- In progressDrilling and construction 4 No. mechanized borehole at selected communities
- In progressConstruction of 1No. 3unit classroom block at yawusukrom
- In progressConstruction of 40No. household toilets at selected communities
- In progressCompletion of the construction of oil palm mill at adamso
- In progressConstruction of football field phase 1 at akrofuom
- In progressConstruction of CHPS compound at amoakokrom
- In progressConstruction of 4-unit 1st phase classroom block at block at akrofuom
- In progressConstruction of 20-seater w/c toilet for boys at akrofuom sec.tech
- In progressConstruction of 20-seater w/c toilet for girls at akrofuom sec.tech
- In progressConstruction of 4 n.o mechanised boreholes at 4 communities
- Starting soonDesign, supervision & construction of 24-hour economy market for adansi akrofuom assembly at akrofuom
- DeliveredConstruction of CHPS compound with nurses' quarters at fahiakobo
- DeliveredDrilling and mechanization of 1No. borehole with fire hydrant at jacobu
- DeliveredRenovation of DCE's residence
- DeliveredRenovation of district fire station at jacobu
- DeliveredConstruction of police station at tweapease
- In progressCompletion of 1No. 3-unit classroom block with mechanized boreholes and 5-seater WC toilet facility
- In progressCompletion of 1No. 3-unit classroom block with ancillary facility at sesease
- In progressConstruction of 1No. 3-unit classroom block with ancillary facility at adoowa
- In progressConstruction of 1No. 3-unit classroom block with ancillary facility at homase
- In progressConstruction of CHPS compound with nurses' quarters at fenaso No. 3
- In progressDrilling and mechanisation of 2No. boreholes with reinforced concrete reservoir stand and overhead tank
- In progressDrilling and mechanisation of 4No. boreholes with reinforced concrete reservoir stand and overhead tank
- In progressCompletion of 1No. 2-unit kindergarten block with ancillary facility at domeabra
- In progressConstruction of CHPS compound with nurses' quarters at donkoase
- In progressConstruction of district education complex
- In progressConstruction of 1-storey 5-bedroom residence for district chief executive at manso-adubia
- In progressConstruction of 1No. 6-unit classroom block with office and store at manso-moshiekrom
- In progressConstruction of CHPS compound at manso-kobriso
- In progressConstruction of CHPS compound at manso-nyamebekyere
- In progressConstruction of 1no 10-seater w/c toilet facility at manso adubia SHS
- In progressConstruction of 1No. 3-unit classroom block at manso watreso
- In progressConstruction of 1No. 2unit KG block with office and store at manso wahaso
- In progressCompletion 1No. 20-seater w/c toilet facility at manso-kwabenaso (legacy project)
- In progressCompletion of CHPS compound at manso afedie (legacy project)
- In progressDrilling and mechanisation of 5No. boreholes at manso wahaso, adimposo No.1, adimposo No. 2, nkontine and essienkyem
- In progressDrilling and mechanisation of 5.no boreholes at kojo nsiakrom, dunwura, manso-nyamebekyere, groso, tontokrom,
- In progressRepair and maintenance of 15.no boreholes district wide
- In progressDrilling and mechanisation of 5No. borehole at manso besease, esumenya, hiamankwa, kobriso and subinso
- DeliveredRenovation of district assembly office block (phase i) at manso nkwanta
- DeliveredCompletion of 1No.6-seater water closet toilet with mechanized borehole at manso nkwanta
- DeliveredRenovation of district assembly block (phase ii)
- In progressCompletion of 1No. 6-unit classroom block, office, store, library with 6-seater water closet toilet with mechanized borehole at asamang
- In progressConstruction of 1No. 3-unit classroom block with office, store and staff common room at atobrakrom
- In progressConstruction of 1No. 3-unit classroom block with office, store and staff common room at adwumam
- In progressConstruction of 1 No. 6-unit classroom block with office, store, and library 6- seater WC toilet with mechanized borehole at abore
- In progressConstruction of 1 No. CHPS compound at kwakokrom.
- In progressConstruction of 2 No. 6-seater water closet toilet with drilling and mechanization of borehole at adwumam and atobrakrom
- In progressDrilling and mechanization of 2 No. borehole with office and overhead tank district wide
- In progressConstruction of 1 No. 2 unit k. g block with mechanized borehole and overhead tank at suntreso
- In progressConstruction of concrete pavement blocks and landscaping at the district assembly office, manso nkwanta
- DeliveredConstruction and furnishing of 1No. CHPS compound at ohenenkwanta
- DeliveredMechanization and construction of overhead tanks for existing 7No. boreholes at kyekyebiase, habitat, obenimase and others
- DeliveredRenovation and refurbishment of official residence of the municipal chief executive
- DeliveredDemolishing and reconstruction of 12-seater toilet facility and drilling and mechanization of 1No. borehole at odumasi-newtown
- DeliveredRenovation of the bungalows of municipal internal auditor and director department of social welfare and community development at lowcost extension
- DeliveredRenovation of accountants bungalow at konongo extension
- In progressDrilling of 7No. boreholes mechanization and construction of overhead tanks
- In progressConstruction and furnishing of 1No. CHPS compound at habitat
- In progressCompletion of 1No. 3-unit classroom block at ohenenkwanta
- In progressDrilling and mechanization of 4No. boreholes and drilling of 3No. manual hand pump borehole at lowcost extension, mayanka extension, ohenenkwanta CHPS and others
- In progress24-Hour economy model market and commercial centre at konongo
- In progressConstruction of 1No. stem basic school (KG, primary and JHS phase one (1)) at nyaboo
- In progressConstruction and furnishing of 1No. health centre at atunsu
- In progressConstruction of 1No. 3-unit classroom block with school furniture at bimma
- Starting soonConstruction of 1No. nurses quarters at atunsu health center
- DeliveredRenovation and part-furnished of municipal chief executive official residence
- DeliveredCompletion of 3-bedroom self-contained bangulow at agogo (legacy)
- DeliveredConstruction of 1-No. CHPS compound at afrisere
- DeliveredRenovation of 2-No. 3 units classroom block at ananekrom
- In progressContruction of 1No. 6 unit classroom block with office, store, staff common room, 6-seater water closet and urinal for agogo saviour school at agogo
- In progressSiting, drilling and mechanization of 1-No. borehole with overhead tank at tebor-agogo
- In progressSiting, drilling and mechanization of 1-No. borehole at oforikobon
- In progressConstruction of 1-No. 3 unit classroom block with office, store, staff common room, 3-seater KVIP toilet and urinal at ensonyameye
- In progressCompletion of 1-No. 2 bedrooms semi-detached staff quarters at agogo
- DeliveredRenovation of municipal chief executive's bungalow at juaso
- DeliveredConstruction of 1No. 3-unit classroom block with office, staff common room, store, library and 4-seater KVIP toilet (legacy project) at nnadieso
- DeliveredConstruction of 1No. 3-unit classroom block with office, staff common room, store, library and 1No. 4-seater KVIP toilet (legacy project) at komeso
- In progressDrilling and mechanization of 1 No. borehole with overhead tank and 5 No. standpipes at kokoado, abrewanko, tanokrom and breku
- In progressDrilling and mechanization of 1 No. borehole with overhead tank and 5 No. standpipes at gyankobaa, kwabeng, domiso and atta ne atta
- In progressDrilling and mechanization of 1 No. borehole with overhead tank and 5 No. standpipes at densereso, kokobeng, tokwai odumasi and agyakoma
- DeliveredInstallation and repairs of street lights from anloga rail crossing to aboabo post office
- In progressConstruction of 1No. CHPS compound with 2-unit staff accommodation, 4-seater w/c toilet with a mechanised borehole at dwendwenase
- In progressConstruction of 1No. 3-unit classroom block with office, store, 4-seater w/c toilet with a mechanised borehole at saabo
- In progressConstruction of 1No. 2-unit KG block with ancillary facilities at tanokrom
- In progressConstruction 1No. 3-unit classroom block with office, staff common room and store at yawkei
- In progressConstruction of 1No. 3-unit classroom block with office, store, staff common room and 1No. 4-seater w/c toilet (legacy project) at tokwai
- Starting soonConstruction of 1No. 24-hour economy market at juaso
- DeliveredConstruction of u-drain along middle b school road - phase one
- DeliveredConstruction of astro turf football pitch at akurem highlanders park
- DeliveredConstruction of u-drain along middle b school road - phase two
- DeliveredConstruction of astro turf football pitch at abaoabo no 2
- DeliveredConstruction of astro turf football pitch and multipurpose sport complex at asawase dogomoro park
- DeliveredConstruction of multipurpose sports complex at akurem
- DeliveredConstruction of multipurpose sports complex at aboabo no .2
- DeliveredProcurement of industrial machines for PWDs
- DeliveredProcurement of industrial machines for start-up kits
- DeliveredInstallation and maintenance of street lights in the municipality
- In progressConstruction of classroom and u- drains at aboabo no 2
- In progressConstruction of classroom block and sanitation facilities at adenyase sawaba
- In progressConstruction of classroom block at asokore mampong rc primary school
- In progressConstruction of classroom block at asokore mampong rc KG
- In progressCompletion of health facilities at adenyase/sawaba
- In progressConstruction of recovery ward
- In progressConstruction of CHPS compound
- In progressContruction of 15 mechanized boreholes
- In progressConstruction of 1No. health center -ahinsan
- In progressConstruction of health center at atonsu agogo south
- In progressConstruction of 1No. 5-seater WC at st. mary school khirapatre
- In progressConstruction of 1No. KG classroom block with office and stores at shakuria islamic basic school atonsu s-line
- In progressConstruction of 18n0. borehole with 5000ltr capacity overhead tank on concrete stand
- In progressConstruction of 17 n0. borehole with 5000ltr capacity overhead tank on concrete stand
- In progressConstruction of 1 n0. storey 6 unit classroom block with office, store and 5-seater WC toilet
- DeliveredConstruction of 12-seater w/c toilet with a mechanized borehole at akosomo
- DeliveredConstruction of 3-unit classroom block with office, staff common room and store at new edwuampong
- In progressConstruction of 1 No. 6-unit classroom block at afasiebon
- In progressCompletion of CHPS compound at asaago, nweneso No.1 & nweneso No.3
- In progressDrilling and mechanization of 8No. boreholes at asaago, aboabokese, darko, apemanim, afasiebon, nkoranza, dentekrom & trede
- In progressConstruction of a 24-hour model market
- In progressConstruction of 1no CHPS compound with mechanized borehole at mpasatia
- In progressConstruction and mechanization of 2No. boreholes at akentensu
- In progressConstruction of police station, mechanized borehole, furnishing and external works
- In progressConstruction of 1no CHPS compound with mechanized borehole at wansamire
- In progressConstruction of police station, mechanized borehole, furnishing and external works at bayerebon
- In progress6-Unit classroom block, office, store, 4-seater w/c toilet facility with mechanized borehole and 300litres overhead tank at agogoso
- In progressConstruction and mechanization of 1No. boreholes at banniekrom
- In progressConstruction of police station, mechanized borehole, furnishing and external works bayerebon
- In progressConstruction and mechanization of 2No. boreholes at okyerekrom
- In progressConstruction and mechanization of 2No. boreholes nyinahin zongo
- In progressConstruction and mechanization of 2No. boreholes abobowin
- In progressConstruction and mechanization of 2No. boreholes at okyerekrom
- In progressConstruction and mechanization of 2No. boreholes at kataatwoa
- In progressConstruction and mechanization of 2No. boreholes at adupri
- In progressConstruction and mechanization of 2No. boreholes at otaakrom
- In progressConstruction of police station, mechanized borehole, furnishing and external works at kotokuom
- In progressConstruction of 1No. 2-unit KG block with office, store, auxilliary facilities and mechanized borehole at akotaa
- In progressConstruction of 1No. 6-unit classroom block, office, store, 4-seater w/c toilet facility with mechanized borehole and 300litres overhead tank at agogoso
- In progressConstruction and mechanization of 1No. boreholes at baniekrom
- In progressConstruction and mechanization of 1No. boreholes at nyinahin zongo
- In progressConstruction and mechanization of 1No. boreholes at abobowin
- DeliveredRefurbishment of 1 No. 2 story administration block with offices, assembly hall and water closet facilities.
- DeliveredAmoabeng KG block
- In progressAbuakwa classroom block
- In progressAgogo chips compound
- In progressSlaughter hub
- In progressMim CHPS compound
- In progressConstruction of 24-hour model market at abuakwa
- DeliveredRehabilitation of 3 unit classroom block at amakye bare
- DeliveredRehabilitation of4 unit classroom block at amakye bare
- In progressRehabilitation of 3 unit classroom block into offices at barekese
- In progressConstruction of 1 No. 6 unit classroom block with other facilities at akwaboa
- In progressConstruction of 1 No. CHPS compound at ntensere
- In progressCompletion of isolation center into wards and theatre at asuofua
- In progressCompletion of 1No. CHPS compound at danso
- In progressMechanization of 11 No. borehole at mfensi, taabere, asamang, amoaman, adankwame, baarso, bonsua, worapong, boahenkwaa No.1, adagya and barekese
- In progressConstruction of 1No. 3-unit KG classroom with ancillary facilities at nketia
- In progressConstruction of 1 No. community center at asuofua asamang
- DeliveredConstruction of pavement at bekwai market
- DeliveredConstruction of 4No. borehole fitted with pumps and overhead tanks at (adankragya, kwaman, atuogyabie and sesekro primary)
- In progressCompletion of 1No. dining hall at denyaseman s.h.s (legacy)
- In progressConstruction of 1No. 3-unit classroom block, store and 4-seaterw/c toilet and mechanized borehole with 3000 litres overhead tank at bodoma
- In progressConstruction of 1No. KG block store and 2-seaterw/c toilet and mechanized borehole with 3000 litres overhead tank at dotom
- In progressConstruction of 1No. 3-unit classroom block - seater w/c toilet and mechanized borehole with 3000 litres overhead tank at brosankro (legacy)
- In progressConstruction of 3No. mechanized borehole at (betinko-kyekyewere, ridge and abuoso).
- DeliveredConstruction of 1No. 3-unit classroom block with office and store at asiwa presby primary
- DeliveredConstruction of 1No. 6-unit classroom block with office, store and 4-seater KVIP for d/a primary at nsuaem ii at
- DeliveredConstruction of office block for agric directorate at asiwa
- DeliveredConstruction of pavement of asiwa lorry park with ticket post and passengers rest shed
- DeliveredConstruction of concrete pavement of the entrance of asiwa lorry park with 2No. rest shed and 10-seater toliet facility at asiwa
- DeliveredConstruction of 1No.4-unit single room self-contained teachers quarters at adeito (legacy project)
- DeliveredConstruction of health insurance office at asiwa
- DeliveredRenovation of old assembly block and isolated centre for covid-19 with attached garage for fire tender and ambulance vehicle
- In progressConstruct of 1-No. 2-unit KG classroom block at mafi
- In progressConstruction of 1-No. CHPS compound at nsese
- In progressConstruction of 1-No. CHPS compound at korchikrom
- In progressConstruction of 1No. 6-unit classroom block with office, store and 4-seater toliet facility at damascus
- In progressConstruction of 1No. 3-unit classroom block with office, store and 2-seater toilet facility at freso
- In progressDrilling and mechanization of 1No. borehole with 6,000 litter capacity overhead tank at nsuta
- In progressDrilling and mechanization of 1No. borehole with 6000 littre capacity overhead tank at semdadieso
- In progressDrilling and mechanization of 1No. borehole with 6000 littre capacity overhead tank at besease
- In progressDrilling and mechanization of 1No. borehole with 6000 littre capacity overhead tank at anwiaso
- In progressDrilling and mechanization of 1No. borehole with 6000 littre capacity overhead tank at tebeso i
- In progressDrilling and mechanization of 1No. borehole with 6000 littre capacity overhead tank at korchikrom
- In progressDrilling and mechanization of 1No. borehole with 6000 littre capacity overhead tank at amormose
- In progressDrilling and mechanization of 1No. borehole with 6000 littre capacity overhead tank at ahweaso
- In progressDrilling and mechanization of 1No. borehole with 6000 littre capacity overhead tank at tebeso ii a
- In progressDrilling and mechanization of 1No.borehole with 6000 littre capacity overhead tank at tebeso ii b
- In progressDrilling and mechanization of 1No.borehole with 6000 littre capacity overhead tank at anyanso
- In progressDrilling and mechanization of 1No. borehole with 6000 littre capacity overhead tank at aframoase
- In progressDrilling and mechanization of 1No. borehole with 6000 littre capacity overhead tank at aboabo
- In progressDrilling of 1No. borehole fitted with hand pump at huntaado
- In progressDrilling and mechanization of 1No.borehole with 6000 littre capacity overhead tank at tumfokrom
- In progressDrilling of 1No. borehole fitted with hand pump at tweapease
- In progressDrilling of 1No. borehole fitted with hand pump at tebeso ii JHS
- In progressDrilling and mechanization of 1No.borehole with 6000 littre capacity overhead tank at freboye
- In progressDrilling and mechanization of 1No.borehole with 6000 littre capacity overhead tank at freboye CHPS compound
- In progressDrilling and mechanization of 1No.borehole with 6000 littre capacity overhead tank at ankaase
- In progressConstruction of 1No. 6-unit classroom block with office and store at tebeso ii
- In progressConstruction of 1No. 3-unit classroom block with office, store and 2-seater KVIP at amentoboum
- In progressConstruction of 1No. 3-unit classroom block at minti
- In progressConstruction of 1No. semi-detached staff bungalow at aiwa
- In progressCompletion of 1No. CHPS compound at duase
- In progressConstruction and furnishing of 1 No. CHPS compound and 2 No. bedroom staff accommodation at old kokobriko
- In progressDrilling and mechanization of 5 No. borehole with concrete stand and 5 No. 5000 liters polytank connected to electricity.
- In progressConstruction of 1 No. 3-unit classroom block with offices and teachers hall and 1 No. 6-seater WC with mechanized boreholes and concrete stand and 1 No. 2000 liters polytank connected to electricity at boniagya
- In progressDrilling and mechanization of 5 n0. boreholes with concrete stand and 5 n0. 5000 liters polytank connected to electricity
- In progressConstruction of 1 No. 24-hour-economy model market at kuntanase in the bosomtwe district in the ashanti region
- DeliveredCompletion of 6-unit classroom block with ancillary facilities and furnishing at asamang- (legacy project)
- In progressCompletion of 6-unit classroom block with staff common room, head teacher's office and 120 dual desk, 12 No. teachers tables and chairs, 8 cabinets at fumesua m/a basic school- (legacy project)
- In progressConstruction of 1No. CHPS compound with ancillary facilities, 2No. single room self contained clinic service area, 4No. washrooms, 10No. w/c and mechanized borehole at hwereso.
- In progressConstruction of 6-uint classroom block with office, a store and toilet facilities at ejisu m/a model school
- In progressCompletion of 6-uint classroom block with ancillary facilities and furnishing at sarpeh- (legacy project)
- In progressConstruction of 1 No. 3-unit classroom block with ancillary facilities at domeabra
- In progressConstruction of 1No. CHPS compound with ancillary facilities, 2No. single room self contained clinic service area, washroom, w/c, wards and mechanized borehole at timeabu.
- In progressConstruction of 1No. mechanized borehole at akyawkrom
- In progressConstruction of a mechanized borehole at asotwe
- In progressConstruction of 1No. mechanized borehole at amoam achiase
- In progressConstruction of 1No. mechanized borehole at kwamo
- DeliveredConstruction 1n0. 3-unit classroom block at methodist JHS at sekyedumase
- In progressConstruction of 1n0. 3-unit classroom block - miminaso
- In progressConstruction of 1n0. 3-unit classroom block - anyinasu zongo
- In progressConstruction of 1n0. 3-unit KG block - kwasiakan
- In progressConstruction of 1n0. CHPS compound
- In progressConstruction of 1n0. CHPS compound - ajamasu
- In progressConstruction of 1n0. infirmary/sickbay
- In progressConstruction of 1n0. 12-seater WC toilet with mechanized borehole
- In progressConstruction of 3n0. 18-unit market sheds and a urinal facility
- In progressConstruction of 1n0. 4unit teachers quarters
- In progressDrilling & mechanisation of 2n0. boleholes
- In progressConstruction of 1n0. 3-unit classroom block - liwa-udeen
- In progressConstruction 1n0. 12- seater WC toilet with a mechanized borehole at anyinasu
- In progressConstruction of 24-hour economy market
- DeliveredDesign and fabrication of 2No. metal skip containers
- In progressDrilling and mechanization of 2No. boreholes at residency and sekyerekrom
- In progressCompletion and furnishing of CHPS compound
- In progressConstruction of 1No. 3-unit classroom block with office, store and furnishing.
- In progressRenovation and furnishing of zonal council buildings
- In progressConstruction and furnishing of health center
- In progressConstruction of 1No. 6-unit classroom block with office, store, staff common room, library, furnishing and 6-seater toilet
- In progressConstruction of 1No. 2unit KG block with office and store
- In progressConstruction of CHPS compound
- In progressDrilling and mechanisation of 2No. boreholes
- In progressDrilling and mechanization of 6No. boreholes
- In progressDrilling and mechanization of 15No. boreholes
- Starting soonConstruction of a 24hr economy market
- DeliveredConstruction of 4No. footbridges across various streams
- DeliveredFurnishing of MCE's bungalow at nhyiaeso
- In progressConstruction of paediatric center, ward and staff accommodation at adum
- In progressConstruction of 1No. 6-unit classroom ground floor block at santasi m/a school
- In progressConstruction of 1No. 6-unit classroom ground floor block at adabya islamic school
- In progressDrilling and mechanization of 10No. boreholes at selected communities
- In progressRedevelopment of new tafo market project
- In progressConstruction of 1No. 2 unit KG block with office and store
- In progressDrilling and mechanization of 10No. borehole, 5000 liter tank
- In progressConstruction and completion of 1No. 6-unit classroom block at holy quran islamic primary school
- In progressConstruction of 1 No. CHPS compound at dumanafo
- In progressConstruction of 6-unit classroom block at abira(legacy)
- In progressConstruction ofahwiaa market, nana appiah and ok academy roads (3.75km) pedestrain walkway on both sides
- In progressConstruction of phase one of 1No. market facility with; 1. 80 No. lockable stores, (1 storey), 2. 1655m sandcrete brick pavement
- In progressConstruction of phase two (2) of 1No. market facility with 76No. lockable stores (1 storey), 4No. stores
- In progressConstruction of mamponteng market (24-hour economy market)
- Starting soonConstruction of 6-unit classroom block with office and store at abira r/c primary
- In progressConstruction of 1 No. CHPS compound
- In progressConstruction of 1 No. CHPS compound
- In progressConstruction of 1No. 6-unit classroom block with office and store
- In progressConstruction of 1 No. 3 storey building administration block (legacy)
- In progressConstruction of 1 No. 6-unit classroom ground floor block, office and storeroom (legacy)
- In progressConstruction of 1 No. 6-seater WC toilet block with mechanized borehole and elevated water tank support (legacy)
- DeliveredRenovation municipal auditor's bungalow (legacy)
- DeliveredConstruction of 12-lockable stores at mampong main market (first floor only) (legacy)
- DeliveredRenovation of 3-storey administration block for mampong municipal assembly (legacy)
- DeliveredRenovation of 6-unit classroom block and 2-unit KG blkock at kofiase otuasekan primary
- In progressEvacuation of 2No. refuse dump at adidwan and dislogdement of sludge at residential area, mampong
- In progressConstruction of slaughter house
National results that also reach Ashanti Region (183)
- In progressDVLA offices: 63 now open, up from 33
- In progressTrades and Vocation module
- In progressChieftaincy disputes resolved
- Starting soonMilitary gratuity arrears to be paid (CI 129)
- In progressFeed Ghana ProgrammeFeed Ghana
- In progressAnti-illegal mining force of 1,000 officers deployed
- In progress1,200 unserved communities connected to phone and data
- In progressGirls-in-ICT: 10,000 girls trained
- In progressPayroll audit finds GH¢150.36 million paid to staff who had left
- In progressBirths and deaths registered in 2025
- In progressProductive Safety Net: 83,043 poor and extreme-poor people supported
- In progressSocial Investment Fund community projects
- In progressNational Decentralisation Policy and National Urban Policy sent to Cabinet
- In progressUniversity of Governance and Development: Bill with the Attorney-General
- In progressTree for Life: 31 million seedlings planted in 2025
- In progressTVET vouchers for craftspeople and apprentices
- In progressWork Abroad Programme: placements in the UAE
- In progress2,069 Blue Water Guards protecting rivers
- In progressMining equipment registered and tracked at the port
- In progress9,000 small-scale miners and 700 cooperatives registered
- In progressStool land revenue, first half of 2026
- In progressNew RFID number plates
- In progressAnti-illegal mining operations, January to June 2026
- Delivered9,553 job seekers placed in work by the Labour Department
- In progressRestoration of six forts and castles
- Starting soonNational School Sports Authority
- Starting soon350 container health points for markets and lorry parksFree Primary Healthcare
- In progressSpecialist nurses and pharmacists in trainingMahamaCares
- In progressNew equipment for the Armed Forces and Police
- DeliveredFive-year multiple-entry US visas restored
- In progressBiometric SIM registration law passed
- Starting soonInternet for 270 government facilities (Ghana Digital Acceleration Project)
- Starting soonSecurity services recruitment raised to 40,000 over four years
- In progressConstitution review: Government's position published
- In progressEnvironmental Sanitation Policy and national sanitation strategy finalised
- In progressStrategic Land Administration Reform Project launched
- In progressGeological Survey regulations laid in Parliament
- In progressLand bank for large oil palm farms
- In progressWildlife regulations being prepared for community forest areas
- In progressBiometric international driving permits
- In progress350 small businesses selling online through the MSME Gateway
- In progress'Dig Once' policy to stop fibre cuts from roadworks
- Starting soonSankofa II: €2.5 million for forts, castles and creative industries
- In progressHospitality training: over 4,000 trained
- In progressSocial protection complaints: 7 in 10 resolved
- In progressDay care centres registered
- In progressSupport for vulnerable patients in hospitals
- In progressMahamaCares: Ghana Medical Trust FundMahamaCares
- In progressGhana Accelerated National Reserve Accumulation Policy
- Starting soonLaws to ban sole-sourced contracts and require Parliament's approval to sell state assets
- In progressPublic Officers Code of Conduct Bill laid in Parliament
- In progressRural electrification: 200 of 400 communities connected
- In progressPrivate partners for electricity distribution approved by Cabinet
- In progressSolar systems for public institutions, first 350
- Starting soonEnding schools under trees: 600 new classroom blocks
- In progressNational Food Buffer Stock: GH¢300 million to stabilise food pricesFeed Ghana
- In progress413 schools, colleges and institutions farming under Feed GhanaFeed Ghana
- Starting soonFarmer Service Centres: 660 tractors and 400 harvesters being procuredFeed Ghana
- In progressNational Service Agripreneurs: 3,000 of 10,000 postedFeed Ghana
- Starting soonItaly-Ghana 10,000-hectare irrigated farm, €154 million
- Starting soonSix regional TVET Centres of Excellence
- Starting soon50,000 homes for teachers
- Starting soonNew specialist nursing programmes and degree-level nurse training
- In progressMade-in-Ghana vaccines and medicines
- In progress23 underfunded road projects being completed, 573 km
- In progressMotorbikes for extension officers: 150 of 540 delivered
- Starting soonRoad tolls to return, collected electronically
- In progress300 new buses for public transport
- In progressNational airline: business model submitted
- In progressRural phone and data sites: 1,561 built, 1,144 working
- In progressArmed Forces recruitment: 12,000 over four years, from regional capitals
- In progressFive-day visas at missions; e-Visa coming in 2026
- In progressAdwumawura: 10,887 young entrepreneurs trained
- In progressNational Apprenticeship: 14,000 trained, target raised to 100,000
- Starting soonMilitary training for 10,000 National Service personnel
- In progressAccelerated Export Development Programme launched24-Hour Economy
- In progressFree Primary HealthcareFree Primary Healthcare
- In progressWomen's Development BankWomen's Development Bank
- In progressRent-to-Own housing scheme expanded
- DeliveredDriving theory test in six Ghanaian languages
- DeliveredE-Levy, betting tax, emissions levy and other taxes repealed
- DeliveredGhana Gold Board (GoldBod) set up
- DeliveredPassport backlog of 70,000 applications cleared, with same-day emergency service
- DeliveredChip-embedded passports introduced
- Delivered24-Hour Economy Authority law24-Hour Economy
- DeliveredFisheries and Aquaculture Act, 2025 (Act 1146)
- DeliveredEnvironmental Protection Act, 2025
- DeliveredPower purchase agreements renegotiated, saving US$261.9 million
- DeliveredBECE registration fees paid for every public school candidate
- Delivered13,500 nurses placed on the payroll, trainee nurse fees halved
- Delivered143,099 new businesses registered
- Delivered1,278 illicit weapons seized
- Delivered173,800 disaster victims supported
- Delivered394,688 people newly registered for the Ghana Card
- DeliveredOver GH¢600 million recovered from economic crime
- DeliveredAll four 2025 District Assemblies Common Fund releases paid to assemblies
- DeliveredGuidelines issued for spending the District Assemblies Common Fund
- DeliveredPerformance assessment of all 261 district assemblies (DPAT 9th cycle)
- DeliveredMonthly allowances paid to all assembly members
- DeliveredAllowances of paramount chiefs and queen mothers tripled
- DeliveredNational Sanitation Day re-launched
- DeliveredSliding-scale mining royalties in law (L.I. 2517)
- DeliveredNational seismic monitoring network upgraded
- Delivered24-hour and extended DVLA opening hours24-Hour Economy
- DeliveredDriving licence backlog cleared: 440,000 printed
- In progressRevised Minerals and Mining Policy approved, new Mining Bill endorsed by Cabinet
- DeliveredDigital stickers at the ports raise DVLA revenue
- DeliveredDVLA pays GH¢80.4 million into the Road Fund
- Delivered357 cloned or uncustomed vehicles caught
- DeliveredFree education for learners with special needs
- DeliveredCapitation grants paid, 2023 arrears cleared
- DeliveredStudent loans: ceilings raised by half
- DeliveredMore data for the same price, cheaper home broadband
- Delivered5G opened to competition
- DeliveredNational Artificial Intelligence Strategy 2025 to 2035 approved
- DeliveredPassports delivered to the door: 190,781
- DeliveredCybersecurity: 3,363 incidents handled
- DeliveredGhana's first Climate Atlas and new airport weather station
- DeliveredEducation Regulatory Bodies (Amendment) Act, 2026
- Delivered1.31 million international visitors in 2025
- DeliveredHighlife music and dance on UNESCO's heritage list
- DeliveredRevised Cultural Policy of Ghana launched
- DeliveredClimate action coordinated across government
- In progressCreative Arts Fund and Film Development Fund
- DeliveredNational Household Registry covers all 16 regions
- DeliveredDisability Common Fund reaches 19,760 people
- DeliveredAffirmative Action (Gender Equity) Regulations in force
- DeliveredSupport for survivors of trafficking and domestic violence
- DeliveredAll 261 District Chief Executives appointed, confirmed and trained
- DeliveredPerformance contracts signed with all coordinating directors
- DeliveredNew zoning guidelines and spatial planning manual launched
- DeliveredGhana Sustainable Cities Strategy launched
- DeliveredCommunity development training: educators, women and local enterprise groups
- DeliveredTighter rules for allocating state lands
- DeliveredFive education laws passed in 2025
- DeliveredText reminders before your driving licence expires
- DeliveredElectronic receipts for every DVLA payment
- DeliveredAI lesson-planning app for senior high school teachers
- DeliveredWork placements for TVET students with 1,820 employers
- DeliveredFree mobile roaming with The Gambia
- DeliveredSmartphone use reaches 71.8% of Ghanaians
- DeliveredGovernment IT spending now needs technical clearance
- DeliveredSign language and Braille maths curricula for special schools
- DeliveredData Protection Commission registrations nearly doubled
- DeliveredBlack Star Experience: year-round culture and tourism programme
- DeliveredBook Ghana tours online: Tourism Marketplace and Investment Platform
- DeliveredNational Gender Policy and Early Childhood Policy launched
- DeliveredPlan for social protection in emergencies launched
- DeliveredChild protection: 104 children back with their families
- DeliveredFirst FLEGT timber licences issued, first in Africa
- In progressSecondary Cities programme: 121 km of roads and 25 markets
- DeliveredSocial Protection Act, 2025 (Act 1148)
- In progressValue for Money Office Bill laid in Parliament
- DeliveredUS$709 million Eurobond repaid ahead of schedule
- DeliveredCredit rating upgrades from Fitch, Moody's and S&P
- DeliveredVAT cut to 20% and the COVID-19 levy abolished
- DeliveredSpecialised High Courts for Auditor-General report cases
- DeliveredUS$500 million World Bank guarantee fully restored
- DeliveredAll gas arrears to ENI and Vitol paid, about US$500 million
- DeliveredECG Single Holding Account in operation
- Delivered70,000 farmer cooperatives set up
- DeliveredNHIS levy uncapped, claims paid on time, provider tariffs to double
- DeliveredVaccine budget up 46%; HPV vaccine introduced
- DeliveredGH¢10 billion owed to road contractors paid
- DeliveredGhana Knowledge and Skills Bank: 62,000 learning resources online
- DeliveredOperation BOAFO: Ghanaian engineers help Jamaica rebuild
- DeliveredVisa waivers agreed with 11 countries
- Delivered86,000 young people engaged by the Youth Employment Agency
- In progress114 illegal mining cases in court
- DeliveredPassport services in all 16 regional capitals
- DeliveredVAT on mineral exploration abolished
- DeliveredSchool feeding: 4.53 million pupils fed every school day
- Delivered661,687 farmers registered for Feed Ghana inputsFeed Ghana
- In progressLEAP cash grants up 70%
- In progressOne Million Coders ProgrammeOne Million Coders
- In progressFree sanitary pads for schoolgirlsFree Sanitary Pads
- In progressNo academic fees for first-year tertiary studentsNo Academic Fees
- DeliveredFree tertiary education for students with disabilities
- In progressNew KG to Primary 6 curriculum with STEM, AI and coding
- Starting soonSTARR-J: 210 secondary and TVET schools to expand
- DeliveredNational Defence University Bill passed
- In progressFree SHS and TVET: 1.6 million students
- In progressNational TVET Fund: Bill being drafted